Friday, March 27, 2009

Semirara Disaster

semirara-map1
Map of Semirara Island, Sitio Bigo, Brgy. Alegria is south of the shiploader. The Unong Pit was the 1st operated in the 1980s until 1998, the 2nd pit (Panian) is still in operation. Himalian is the proposed 3rd pit.
tao-1481
Backdrop is the 15 MW coal-fired power plant. The black-bottom of the fisherman’s banca  indicates the coal residue in the waters.
shore-coal2
Virtual reclamation caused by the refuse / tailings from the coal washing facility. Note the black color of the sea with coal-bits lining the shore.
tao-133
Coal bits brought by the tide to the white coralline shore.
seaweeds-disease2
Seaweeds suffer from the coal residue.
tao-729
Seaweeds is a major livelihood of the communities.
skin-disease
Even the fisherfolks suffer from the coal-residues with sore skins.
36290016
Dying mangroves cut, burned and bulldozed over.
tao-a
Former mangrove areas that were bulldozed have been fenced-off and planted with coconut trees.

No comments:

Post a Comment